At the beginning you have enough time and no major problems. Blast your way into the mountain, clear the tunnel and position the giant drill. Once the TNT charges are placed you can start the blasting to create the tunnel entrance. The excavated material will be loaded by a shovel dozer on a dump truck and transported to the storage site. As soon as the entrance is cleaned up the huge tunnel drilling machine will march up. But this monster can only start operation if it is supplied with sufficient building material. This has to be delivered by crane and train. You have to steer all vehicles like the maintenance van, crane, tunnel drilling machine or the fire brigade...

Statistics
How it works

The statistics above update daily and provide insight into how well articles, files, videos, images and other content you post is affecting the popularity of your game. If you wish to track these statistics on your homepage, blog, facebook or even in news and forum posts here, use the embed code provided.

Please note: all content linked with your profile including archived downloads, news etc is still being tracked and included on the above graph even if it isn't mentioned.

Boost your statistics

We recommend you link to your game profile on your homepage, blog, forum and other communities you are a member of like Facebook and X. To help you do this you can copy and paste any of the share options code provided, or check out our mediakit.