At the beginning you have enough time and no major problems. Blast your way into the mountain, clear the tunnel and position the giant drill. Once the TNT charges are placed you can start the blasting to create the tunnel entrance. The excavated material will be loaded by a shovel dozer on a dump truck and transported to the storage site. As soon as the entrance is cleaned up the huge tunnel drilling machine will march up. But this monster can only start operation if it is supplied with sufficient building material. This has to be delivered by crane and train. You have to steer all vehicles like the maintenance van, crane, tunnel drilling machine or the fire brigade...

Post article Articles

No articles were found matching the criteria specified. We suggest you try the article list with no filter applied, to browse all available. Post article and help us achieve our mission of showcasing the best content from all developers. Join now to share your own content, we welcome creators and consumers alike and look forward to your comments.